Quantcast
Channel: SCN : All Content - SAP Environment, Health, and Safety Management (SAP EHS Management)
Viewing all articles
Browse latest Browse all 1630

CG02 Date of Last Change to Specification As a Whole

$
0
0
Date of Last Change to Specification As a Whole

Specification (CG02) Administration Data (at the specification header)

reports Whole Specification changed by and changed on.

 

 

Performance Assistant (Help) on Whole Specification Changed On reports:

---------------------------------------------------------

Date of Last Change to Specification As a Whole

Key date on which the specification was last changed.

 

 

Except for changes to the header data, the system takes all data that

relates to the specification into account, such as changes to:

 

 

Identifiers

Assignments of regulatory lists

Value assignments

Components

User-defined texts

Notes

The key date is specified when the specification workbench is started.

It

is not necessarily the same as the current date.

 

 

To determine the date of the last change to the specification in a

customer-defined program you can read out the specification time stamp

using function module EHSB_TMSTMB_READ_TIMESTAMPS, or you can follow

the

instructions in SAP note 874191.

 

 

The date of the last change to the specification is always set to the

key

date on which the specification was last processed. This is not always

the date of the last change to the specification (see SAP Note 874191).

--------------------------------------------

 

 

We are not able to 1) find SAP Note 874191 or function module

EHSB_TMSTMB_READ_TIMESTAMPS


Viewing all articles
Browse latest Browse all 1630

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>